Process pain points
Hard coating generates heat faster than a plain DC ramp can manage. Without a long soft start and an off interval, the layer burns instead of growing. The power supply has to shape the cycle, not simply deliver current.
What the power supply must deliver
The on/off ratio reaches 500:1 and soft start runs from 1 to 32 minutes. Output accuracy is ±1%. Operators choose DC, a multi-stage curve, single pulse, or dual pulse depending on the part and the coating spec.
| Parameter | Value |
|---|---|
| Maximum on/off ratio | 500:1 |
| Soft start | 1–32min |
| Output accuracy | ±1% |
| Modes | DC / multi-stage curve / single pulse / dual pulse |
Matching model
Standard profile coating uses the anodizing power supply at 0–1000kVA with 1%–3% ripple. Micro-arc oxidation has its own platform. Hard coating stays with this unit because of the duty ratio and ramp control.
Verification
Acceptance checks the soft start range, the 500:1 ratio, and ±1% accuracy against the coating recipe. Standard and custom builds ship in 15–20 days with a one-year warranty. Current density is set by the process.



